CTW130 SADARA & JUBAIL RAILWAY NETWORK/ SAUDI ARABIA

//CTW130 SADARA & JUBAIL RAILWAY NETWORK/ SAUDI ARABIA
Project Details

Category:

Project Description

Owner: Saudi Arabian Railways (SAR)

Length: 69,3 km

Designer & Contractor: Yapı Merkezi & Shibh Al Jazira Joint Venture

Our Scope : Sourcing and Procurement of Various Project Materials and Machinery  Equipment  Specialized Technical Design/Consultancy Services.

Project Description :CTW 130 Project consist of Sadara Rail Project which will connect the Jubail Railway Network and then permit the transportation of petroleum products from Sadara Plant to the Jubail Commercial Port (JCP) and King Fahad Industrial Port (KFIP). This project involves mainly the design and for Sadara Plant, JCP and KFIP.