DAR ES SALAAM – MOROGORO RAILWAY/ TANZANIA

//DAR ES SALAAM – MOROGORO RAILWAY/ TANZANIA
Project Details

Category:

Project Description

Owner: Tanzania Railway Corporation (TRC)

Length: 202 km

Designer & Contractor: Yapı Merkezi

Our Scope : Sourcing and Procurement of Various Project Materials and Machinery  Equipment  Specialized Technical Design/Consultancy Services.

Project Description :The first phase of the 1,224 km total line, the 202 km long Dar es Salaam – Morogoro Railway Project, is the most critical part of the project. When the 5-part line is completed, it will connect Uganda, Rwanda, Democratic Republic of Congo and Tanzania, and provide access to the Indian Ocean for all related countries.

202 km-long single line will be constructed at a design speed of 160 km/h between Dar es Salaam and Morogoro. During the 30-month project, a total of 33 million cubic meters of excavation work will be undertaken; 96 pieces of 6,500 meter-long bridge and overpasses, 460 culverts, 6 stations and repair and maintenance workshops will be constructed .